Defnyddio (kWh) | CO2 (kg) | Cost (£) | Arbedion posib | % Newid | |||
---|---|---|---|---|---|---|---|
Trydan | Wythnos ddiwethaf | 2,740 | 540 | £412 | n/a | +4.1% | |
Y llynedd | 118,000 | 19,000 | £17,700 | £7,330 | +4.5% | ||
Nwy | Wythnos ddiwethaf | 1,920 | 403 | £57.60 | n/a | +9.3% | |
Y llynedd | 208,000 | 43,600 | £6,230 | dim | +16% |
Arbed costau fesul blwyddyn |
Llai o allyriadau fesul blwyddyn |
Cost anfon |
||
---|---|---|---|---|
Lleihau eich defnydd trydan brig
|
£1,600 | 1,900 kg CO2 |
0c | Dysgu rhagor |
Lleihau eich defnydd o nwy y tu allan i oriau
|
£1,700 | 12,000 kg CO2 |
0c | Dysgu rhagor |
Lleihau eich llwyth sylfaenol trydan
|
£6,300 | 7,200 kg CO2 |
0c | Dysgu rhagor |
Lleihau eich defnydd blynyddol o drydan
|
£7,300 | 8,200 kg CO2 |
0c | Dysgu rhagor |
Lleihau eich defnydd o drydan y tu allan i oriau
|
£2,800 | 3,100 kg CO2 |
0c | Dysgu rhagor |
Gweld rhagor o gyfleoedd |